Living Room & Kitchen Interior Design
How we work
From the first email to the final handover.
Every Doyenne project moves through four phases. The phases are the same whether your package is concept-only or full realization — what differs is how far we travel them with you and how much of the build sits on our side of the contract.
-
01 Phase 1 — Discovery
Typical duration: 1 week
A free 30-minute call. We listen, ask, and figure out whether your project fits one of our packages — or whether you would be better served by a different studio.
What we deliver
- Recorded video consult
- Written brief recap (one page)
- Package recommendation with rationale
- Initial timeline estimate
What you do
- Bring photos / sketches / Pinterest of the space
- Share budget range (even rough)
- Tell us your involvement preference (remote / on-site)
-
02 Phase 2 — Design
Typical duration: 3–8 weeks
Brief, space planning, concept design, and 3D visualization. You see the space before any wall moves.
What we deliver
- Design brief (signed off before we start)
- Space plan options (2–3 alternatives)
- Concept boards (materials, palette, lighting)
- 3D photoreal renderings of key spaces
- Weekly Friday review calls
What you do
- Approve or revise concept boards
- Attend weekly review calls
- Final sign-off on selected concept
-
03 Phase 3 — Documentation
Typical duration: 2–6 weeks (parallel to Phase 2 closing)
Technical drawings, material specifications, lighting plan, and contractor handover documents. (Skipped on Concept-only.)
What we deliver
- Construction drawings (DIN-compliant)
- Material and finish schedules
- Lighting plan with fixture specifications
- Contractor tender document set
- Clarifications log for the build
What you do
- Review the spec book
- Approve finish samples (we ship physical samples for DACH projects)
- Final documentation sign-off
-
04 Phase 4 — Build
Typical duration: 3–9 months depending on scope
Either we supervise your contractor (Package 3) or we deliver turnkey on our own contracts (Package 4). Skipped on Packages 1 and 2.
What we deliver
- Contractor coordination calls
- Monthly on-site supervision visits (DACH)
- Photo + written reports after each visit
- Milestone QA checklists
- Snag list and final handover walkthrough
What you do
- Receive monthly site reports
- Approve milestone payments
- Final walkthrough and acceptance
What stays the same on every project
-
Senior-led from start to finish
No junior delegation. The senior designer who runs your discovery call leads your project through handover.
-
Weekly Friday review, every project
A 30-minute video call every Friday during active design or build. Same cadence whether you are around the corner or across Europe.
-
Written everything
Decisions, change orders, milestone approvals — all confirmed in writing. The Friday email is the source of truth.
-
Photos and reports after every site visit
For supervised and turnkey builds: written reports plus photos within 48 hours of every site visit.
Same process, every market
We run this process from Pristina across every city we work in
Whether your build is in Berlin or Pristina, the four phases are the same — only the supplier network and travel cadence change. Pick a city to see what that looks like locally.